Construction of a new spray tower in record time at DP SupplyConstruction of a new spray tower in record time at DP SupplyConstruction of a new spray tower in record time at DP SupplyConstruction of a new spray tower in record time at DP Supply
  • Company
    • endeco company
    • Numbers & cacts
    • Team
    • References
    • endeco Group
  • Services
  • Products
    • Products
    • Silo Systems & Tank Farms
    • Dosing Systems – Your Products Assorted Precision-Weighed and On Time
    • Mixing Systems – The Quickest Way from Raw Material to a Perfect Mixture
    • Dissolving and Dosing Systems
    • Mobile Big Bag Filling System
    • Dense or Lean Phase Conveying
    • Flexible Storage and Mixing Container System Plus Emptying Station
    • System Engineering and Consulting – With a Plan!
  • Contact
  • Karriere
MENU
English
  • German

Construction of a new spray tower in record time at DP Supply

spruehturm-bau-rekordzeit-endeco-dp-supply

Bilder: Einheben des Turmkörpers ins neue Produktionsgebäude

endeco realizes the new construction of a spraying tower at DP Supply GmbH in Beesten (GER) in record time.

At the beginning of 2018, the budget for the realization of the new spray tower was released.

However, after the preliminary planning had already been completed, the concept had to be changed fundamentally. In addition to pea protein also fat-enriched foods based on milk protein, sugar and skim milk and basic powders for the IFT sector were to be produced.

The existing spray tower had to be completely removed from the building, which was to be used for the plant peripherals, the building had to be refurbished and the new plant components integrated.

spruehturm-bau-rekordzeit-endeco-dp-supply
spruehturm-bau-rekordzeit-produktionsgebaeudeendeco-dp-supply

Pictures: Lifting the tower body into the new production building

In parallel, even before the shutdown of the old production plant, a new building for the tower chamber, the cyclones, the exhaust air filter, the fluidized bed and the filling technology was built in reinforced concrete, and the new plant components were welded in the inner courtyard.

During the detail engineering, several hurdles had to be overcome with regard to the space requirements of the machine and plant components, the permissible overall construction heights and the conditions in approval procedures. Already in March/April 2018, the tenders for the machinery and plant trades were sent out.

vorlagebehaelter-hochdruckpumpe-spruehturm-bau-rekordzeit-endeco-dp-supply
spruehturm-hochdruckpumpe-bau-rekordzeit-endeco-dp-supply
produktzufuhr-spruehturm-hochdruckpumpe-bau-rekordzeit-endeco-dp-supply

Pictures: Feed tank and high-pressure pump / Product feed to spraying tower

In June 2018, the order for the spray tower was placed with the company Lübbers Anlagen- und Umwelttechnik GmbH. Due to the very tight schedule with regard to the commissioning in October 2019, the detailed engineering was advanced together and in very close coordination with all companies involved in the project, a tight installation schedule was prepared and the commissioning was coordinated. In parallel, the existing wet mixing area was redesigned, refurbished, modernized and expanded. Pneumatic conveying systems and part of the filling and product feeding technology were also renewed.

zyklone-spruehturm-bau-rekordzeit-endeco-dp-supply
infrastruktur-spruehturm-bau-rekordzeit-endeco-dp-supply
turmkoerper-spruehturm-bau-rekordzeit-endeco-dp-supply

Images: Cyclones / Infrastructure / Tower body

Particularly noteworthy is the cooperation with the project team of the customer DP Supply, which was available with expertise and contributed significantly to the success of the project through its decisiveness.

The commissioning of the spray tower took place with a delay of only 14 days on the basis of the schedule drawn up in March 2018. The project was realized with a total project time of 22 months from budget approval to commercial production of the first spray product.

produktkuehlung-siebtechnik-spruehturm-bau-rekordzeit-endeco-dp-supply

Image: Product cooling and screening technology

Dennis Joesten
(Head of Sales)

Inquire now and ask for advice:

Tel.: 02683/94318-22
E-Mail: joesten@endeco-gmbh.de

Contact us

Your contact person: Dennis Joesten (Head of Sales)

    endeco plant engineering & engineering advantages:

    • Complete solutions from a single source - systems tailored to your needs to increase efficiency through optimal adjustments, for higher productivity with maximum plant safety
    • Owner-managed family business guarantees customer proximity through flat corporate hierarchies
    • Guarantee for long-lasting and future-proof quality with high availability and sustainability - DIN EN ISO 9001 certified
    • Reliable and fair partnership secures long-lasting business relationships worldwide
    • Many years of experience in liquid and bulk handling
    • Service on site by our own assembly teams
    • Customer proximity and competent advice from our own sales force
    • Development of innovative and customized solutions

    Weitere Beiträge

    Asns Ingredient Sia Endeco Gmbh
    08.08.2024

    ASNS Ingredient SIA awards contract to endeco GmbH


    mehr erfahren
    03.01.2024

    Protein Application Center ready: Processing solutions along the entire value chain


    mehr erfahren
    endeco protein food gmbh
    02.12.2022

    READY TO GO ! endeco protein & food GmbH


    mehr erfahren

    Recent Posts

    • ASNS Ingredient SIA awards contract to endeco GmbH
    • Protein Application Center ready: Processing solutions along the entire value chain
    • READY TO GO ! endeco protein & food GmbH

    Archives

    • August 2024
    • January 2024
    • December 2022
    • June 2022
    • April 2020
    • January 2019
    • December 2018
    • October 2017

    endeco GmbH
    Industriepark Nord 105
    53567 Buchholz-Mendt
    Germany

    Startseite » Construction of a new spray tower in record time at DP Supply

    1 Stern / Star2 Sterne / Stars3 Sterne / Stars4 Sterne / Stars5 Sterne / Stars

    PHONE
    +49 2683.94318-0

    FAX
    +49 2683.94318-60

    E-MAIL
    welcome@endeco-gmbh.de

    Zer Qms 9001 18001 Endeco
    © endeco GmbH | Datenschutz / Disclaimer | Impressum / Imprint
    Realisation, Webdesign, SEA & SEO